General Motors Corporation Plant 25
Renovation and New Welder Water System
Vacant Plant Converted to Assembly Line
DSD provided services to General Motors for converting 100,000 SF of vacant plant floor into a modern chassis assembly line. The conversion required renovation of the building workspaces, mechanical systems, lighting, and power. The project included replacing six existing rooftop air-handling units, providing a new cooling tower and a welder water system for robotic welding. DSD designed a 3,000-gallon per minute closed loop water system to pump cooling water through the robotic welding arms.